banner

News

May 04, 2024

PRECISION TANK

One bay load out facility with eight 2,500-gallon chemical tanks going through a weigh pot to be injected into line and repack on a scale. Two 250,000-gallon field erected tanks in an earthen dike were existing (stored 32% and ATS)

1M FET and Load Out Building

Lines to Weigh Tank

Catwalk Stairway

Catwalk

Chem Tanks in Dike

Chem Load In - Repack

Chem Piping

Control Room

Inline Chem Meters

Load Out Bay

Load Out Building

Manifold Hot Load

Manifold

Repack Chem Load In

Weigh Tank

This facility was designed for speed and accuracy with the future in mind. Can load out in all three bays at once and still load In to the 1M FET.

www.precisiontank.com See all author stories here.

CEDAR COUNTY COOP > TIPTON, IAWHAT WE DESIGNEDPREVIOUSWHAT WE DID Four-Bay Building
SHARE